Author: Civil Yard

Introduction to EVM 0

Introduction to Earned Value Management

Earned Value Management is a comparison of the actual costs of work executed with the budget costs of work executed. For example, every company has some sort of tracking system to indicate how it...

Site Clearance 0

Construction Methodology of Site Clearance

Clearing of land for preparation of the site to start construction activities is called Site Clearance. In other words, Site Clearance is the preliminary/initial process to start the work for construction. This work shall...

Rockfill Embankment 0

Construction Methodology of Rockfill Embankment

SCOPE The work covers embankment constructed with pieces of rock and shall be in accordance with the lines, graded, and cross-section as shown in drawings or as directed by the Engineer. There shall be...

Methodology of Earthwork 0

Construction Methodology of Earthwork

SCOPE This work shall consist of excavation, removal and satisfactory disposal of all materials necessary for the construction of roadways in accordance with requirements of MORT&H specifications and the lines, grades and cross-section shown...

Earned Value Management 0

What is Earned Value Management and Uses?

Earned Value Management (Hereinafter referred to “EVM” also) is a project management method that integrates scope, schedule and cost to assess how the project is performing against the project plan. In other words, It...

Fibre Reinfocement Concrete 0

What is Fibre Reinforcement Concrete?

Fibre Reinforcement Concrete is a mixture of concrete plus fibre. The fibre in concrete helps to hold together but, doesn’t give strength. fibres help concrete in gaining strength after cracking. Fibres are used in...

Dowel Bar 0

What is Dowel Bar? its Purpose and Uses

Dowel bar is a mild steel round and smooth bar provided in between two slabs. However, It restricts the horizontal movement of the slab. Above all, they are placed in the longitudinal direction i.e...