Construction Methodology of Sub Grade

Sub Grade work shall consist of laying, spreading and compaction subgrade layer as per contract drawings with approved and specified material following cause 305 of MORT&H specification. MACHINERY Excavator Dumpers Dozer Motor Grader Vibratory...

Embankment 0

Construction Methodology of Embankment

SCOPE This work deals with laying, spreading, and compacting embankment layers with approved materials as per clause 305 & 900 of MORT&H specification. MACHINERY Excavator Dumper Dozer Motor Grader Water tanker with sprinkler Vibratory...

Introduction to EVM 3

Introduction to Earned Value Management

Earned Value Management is a comparison of the actual costs of work executed with the budget costs of work executed. For example, every company has some sort of tracking system to indicate how it...

Site Clearance 0

Construction Methodology of Site Clearance

Clearing of land for preparation of the site to start construction activities is called Site Clearance. In other words, Site Clearance is the preliminary/initial process to start the work for construction. This work shall...

Rockfill Embankment 1

Construction Methodology of Rockfill Embankment

SCOPE The work covers embankment constructed with pieces of rock and shall be in accordance with the lines, graded, and cross-section as shown in drawings or as directed by the Engineer. There shall be...

Methodology of Earthwork 0

Construction Methodology of Earthwork

SCOPE This work shall consist of excavation, removal and satisfactory disposal of all materials necessary for the construction of roadways in accordance with requirements of MORT&H specifications and the lines, grades and cross-section shown...

Tunnel Forepoling 0

What is Tunnel Forepoling, Purpose and Methods

Tunnel Forepoling defines the placement of near-horizontal steel bars/ pipes/ section around the periphery of the heading to form a rock support cage. in areas of the weak zone. In other words, To support...